Ask for a quotation :

Contact data

Project data:

m (vertical distance between the upstream water level on its maximum and the downstream level, in the tailrace)

m (gross head minus head losses)

Estimated available flow *
(liters/s) during approximately months/year
(liters/s) during approximately months/year
(liters/s) during approximately months/year

Powerhouse operation:

Complementary data

1) Water routing to the turbine

a) Penstock

m

m

m

b) Is the penstock preceded by an open channel ?

m

m

m

c) Is there a tank or any accumulation masonry before the penstock ?

2) Produced energy use

kW

b) Voltage and coupling:

V

Coupling:

m

Scope of supply

I want to be contacted for: