Katuze - Assembly and installation of a JLAKit hydraulic turbine (D.R. Congo)

May 2012

Jean-Luc WILLOT (JLA Hydro) goes to Katuze for the assembly of a JLAKit turbine shipped a few months earlier.

The objective is the installation of a hydro-mechanical unit for the driving of a cassava mill.

Assisted by the local technicians, he assembles the turbine and guides the local team in the civil works required for the installation of the turbine. 

Technical specifications

Turbine JLAKit-30-6AH, 6kW (8HP) under 5.5m of net head

Driving of various receivers: Hammer mill, DC and AC generators


JLAKit - Gougnies (Belgium)

Turbogenerator unit JLAKit-10-6AH

Technical specifications: 16.5kW under 22m of net head

Inter-connected with the domestic network


JLAKit - Trois Ponts (Belgium)

JLAKit-15-6AH Turbogenerator unit

Technical specifications: 3.5kW under 6m of net head

Inter-connected with the domestic network


First JLAKit prototype on test bench